He suggests you can save money by checking out granite yards and stone yards for remnant pieces. “You might find a 36-inch piece of granite left over from someone’s kitchen project and use it for the threshold in the shower doorway,” he says.
Who to hire: Depending on the scope, you might have an architect, engineers if you’re changing the footprint, a designer and all sorts of subcontractors, like a mason, a tile layer, a carpenter, a plumber, an electrician and a general contractor. It will require permits, plumbing inspections etc.
A deluxe bathroom remodel is good for you if: You have the funds, obviously. But at this level, you’re really getting the bathroom you want. Maybe you had been saving up for a new house, but with the economy you decided to stay put. Putting some money back into your home and making it more enjoyable for you is a good investment.
Planning for a Bathroom RemodelBudget breakdown: Once you establish your budget and start hunting for materials, consider
the National Kitchen and Bath Association’s cost breakdown as a guide:
- Design fees: 4 percent
- Installation: 20 percent
- Fixtures: 15 percent
- Cabinetry and hardware: 16 percent
- Countertops: 7 percent
- Lighting and ventilation: 5 percent
- Flooring: 9 percent
- Doors and windows: 4 percent
- Walls and ceilings: 5 percent
- Faucets and plumbing: 14 percent
- Other: 1 percent
Of course, it’s up to you where to spend and where to splurge, but this breakdown is a good starting point. Plus, remember to reserve an additional 10 to 20 percent for unforeseen costs that might come up during construction.
When to remodel: You can do a bathroom remodel pretty much any time of year. The most common time to start is during the winter or spring.
How long it will take: Expect a month or two of planning and picking out materials and finishes. Designer Leslie Molloy says many of her clients usually spend about four to six months doing their own research and figuring out their budget and project scope before contacting a designer. Expect three to eight weeks for construction, depending on the scope.
First step: Figure out which of the three levels of remodeling your project falls into, then start looking at
photos of bathrooms to figure out what style, materials and amenities you want. Molloy advises not to get too carried away with planning before reaching out to a designer for help. Professionals can quickly assess your goals and budget to steer you toward what will work for you.